The Embassy of Latgale GORS informs that the time planned for the drive from Rīga, Jēkabpils, Varakļāni and Daugavpils to Rēzekne should be increased due to the road reconstruction works on the route Viļāni-Rēzekne and Daugavpils – Špoģi. The road condition can extend the time spent on the road.
Following the information provided by „Latvian State Roads”, please observe:
Reconstruction of 13.6 km long road surface section on the highway A12, route Viļāni–Rēzekne. Technological interruption, with no significant influence on the traffic.
Reconstruction of 21 km long road surface section on the highway A13, route Daugavpils–Špoģi. Six traffic light controlled sections, speed limits. Estimated driving time through the reconstruction zone ~ 40 minutes.
More information: http://lvceli.lv/lat/celu_lietotajiem/satiksmes_ierobezojumi/